
Fundamentals · 5 min read
What a Supercharger site is worth.
A site is worth the cash it produces, priced the way buyers price real estate.
The short version
Value ≈ net cash flow ÷ cap rate.
Buyers of income property start with one number: what the asset earns each year after its costs. They divide it by a cap rate, the yield they want. A lower cap rate means a buyer pays more for the same cash flow.
Annual net cash flow
NOI
Cap rate
Buyer's yield
Implied value
Site value
Try it
Move the sliders. Watch the value change.
It opens on a typical Carbon site's net cash flow (≈$250K a year) and the middle of the cap-rate range.
The net cash flow range runs from the lowest to the highest published site figure in Carbon's research.
Cap rates: Asking cap rates on Tesla-signed Supercharger licenses, which already trade as net-lease assets, 4.85%–6.75%. Listings: Tumwater, WA (Kidder Mathews); Birmingham, AL (SRS via Crexi). Asking rates, not closed sales.
Implied site value
$4.31M
$250K ÷ 5.80%
Illustration of how a buyer might value a cash-flowing site. Not an appraisal, and not a projection of any sale price.
What drives value
Four things move the number.
Each one changes net cash flow or how long it lasts. Figures are typical across Carbon's published site research.
Utilization
35%
How many hours the stalls are busy: more sessions, more cash flow. This is the typical level Carbon sites are underwritten at. For comparison: U.S. average 15.9% (Paren, Q3 2026).
Price per kWh
$0.51
What drivers pay for each kWh. A typical price across Carbon's published site research.
Operating costs
73%
Electricity (including demand charges), the payment to the site host and maintenance, as a share of a typical site's revenue.
Agreement term
15 years
How long the site can keep earning. Carbon targets 15-year site agreements with property owners.
How value builds
Each stage removes a risk.
A site's value isn't fixed. It builds as the site moves from a signed agreement to a working charger. We describe the stages, not prices.
- 01
Site control
- Site agreement signed with the property owner
The right to build is secured. Until approvals and power are in hand, much of the value is still potential.
- 02
Shovel-ready
- Tesla approval
- Utility capacity
- Permits
The big unknowns are resolved: the network, the grid and the city have said yes. What remains is construction.
- 03
Energized
- Construction
- Energized, then cash flowing
The site is charging cars. Its value now rests on measured sessions and the net cash flow they produce.
Our view
Why it matters to you.
Our view, not a guarantee.
Cash flow on its own
Monthly distributions come from charging revenue after costs and fees. That income doesn't need anyone to buy a site.
A resale on its own
A cash-flowing site with a long agreement is the kind of asset income buyers price with a cap rate. That value doesn't need distributions to exist.
The investment can stand on either one, so it depends on neither. Distributions and sale values are not guaranteed.
Sources
- 01Asking cap rates on Tesla-signed Supercharger licenses, which already trade as net-lease assets4.85%–6.75% cap-rate range. Listings: Tumwater, WA (Kidder Mathews); Birmingham, AL (SRS via Crexi). Asking rates, not closed sales.
- 02Paren, Q3 2026 U.S. fast-charging report, via EVwireU.S. average fast-charging utilization of 15.9%.
- 03Carbon site researchTypical utilization, price, operating costs and net cash flow across the fund's published sites.
Next step
Own a share of cash-flowing sites.
See each site's stage and the research behind it.
