
Infrastructure · 4 min read
Why we build on Tesla Superchargers
The largest, most reliable fast-charging network in America, now open to every EV.
Why Superchargers
The network drivers already trust.
Six reasons the Supercharger network is the foundation of every Carbon site.
Largest network
85,000+stalls
At more than 9,000 sites worldwide.
U.S. market leader
~49%of U.S. ports
Of all U.S. fast-charging ports are operated by Tesla.
Proven demand
69Msessions
In Q3 2026, with a record 2.4 TWh delivered, up 29% year over year.
Reliability
>99%uptime
Built for uptime. Tesla reports network uptime above 99%.
Tesla runs it
24/7driver support
Tesla provides the hardware, software, payments, maintenance and 24/7 driver support. That removes operations from the fund's plate.
Open to every EV
NACS + CCS1
The V4 post supports both standards, and its longer cable reaches non-Tesla charge ports.
Why V4 specifically
Tesla's newest hardware, at every stall.
NACS + CCS1
Open to all EVs
Both charging standards on one post, with a 3 m cable that reaches non-Tesla charge ports.
500 kW
Latest technology
Up to 500 kW per post, Tesla's current-generation hardware.
1 → 8
Cost-effective
One cabinet powers 8 posts, sharing up to 1,200 kW between them.
Tesla-operated
Reliable
Tesla monitors, maintains and supports every post.

Drivers charge where they shop, eat and stay. That's the dwell time our sites are built around.
Technical specs
What's being installed.
Each site pairs V4 posts, the part drivers plug into, with a cabinet that powers them.
| Max output | 500 kW |
|---|---|
| Cable length | 3 m |
| Charging standards | NACS and CCS1 |
| Payment | Credit card reader |
| Total output | Up to 1,200 kW, shared across 8 posts |
|---|---|
| Output range | 180–1000 VDC |
| Efficiency | Above 96% |
| Vehicle architectures | 400–1000 V |
Each system also includes connectivity infrastructure. Sources are listed below.
Our view
Why it matters for investors
Our view, not a sourced claim.
- 01
Faster sessions
Faster sessions mean each stall can serve more sessions in a day.
- 02
Universal access
Every EV can plug in, which widens the customer base beyond Tesla owners.
- 03
Lean operations
Tesla runs the hardware, payments and maintenance, which keeps the fund lean.
- 04
Current-generation hardware
Sites start on Tesla's newest design rather than an older one.
Sources
Sources
- 01Drive Tesla Canada, citing Tesla Charging85,000+ stalls at 9,000+ sites worldwide.
- 02Paren, Q3 2026, via EV Infrastructure News~49% of U.S. fast-charging ports.
- 03EVwire, Oct 5 2026 (Tesla Charging Q3 2026 scorecard)69 million sessions and a record 2.4 TWh in Q3 2026, up 29% year over year.
- 04Tesla, “Supercharging | Over 99.9% Network Uptime” (official Tesla video)Network uptime above 99%.
- 05InsideEVs, Tesla starts rolling out 500 kW SuperchargersV3 cabinets capped at 250 kW; V4 cabinets up to 500 kW.
- 06Tesla, Supercharger for BusinessPost and cabinet output, output range, efficiency, cable length, NACS and CCS1 support.
- 07Tesla, Supercharger for Business: get startedCredit card reader and connectivity infrastructure.
- 08Electrek, Sep 29 20253 m cable and easier access for non-Tesla EVs.
- 09CarExpert400–1000 V vehicle architectures.
Next step
See the sites behind the fund.
See every site, its stage and the research behind it.
Explore the fund