Virginia Avenue
East Point, GA
Illustrative image
- Projected IRR
- 36%
- Est. annual revenue
- $712K
- Stalls
- 6
Projected
Projected
Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.
01 / Comparable charging stations
0 stations within 3 miles. Select a row to find it on the map.
02 / Site summary
Greenfield site with 6 Supercharger stalls at a retail location in East Point, GA.
- Property type
- Other
- Utility
- City of East Point (GA)
- Proposed stalls — V4 Supercharger
- 6
- Opportunity type
- Greenfield
- Agreement type
- Ground lease
- Term
- 15 years
- Renewals
- -
- ◇152,000 vehicles a day on the nearest arterial
- ◇15 fast-charging sites within 3 miles averaging 34.6% utilization
- ◇Freeway access nearby
03 / Trade area & traffic
130,000
Daytime population$52,000
Median household income42%
Of local EVs are Teslas152,000
Daily traffic (AADT)- Median household income, trade area
- $52,000
- Freeway access
- Yes
- Fast-charging ports within 3 mi
- 25
- Fast-charging sites within 3 mi
- 15
Hartsfield-Jackson airport hotel corridor and Delta HQ workforce Carbon estimates; not independently verified.
04 / Charging demand
Observed utilization at comparable stations
32% – 39%
Range across 2 reported comparable stations, 35.5% blended. Carbon underwrites 38.5%.
- Underwritten utilization
- 38.5%
- Modeled price per kWh
- $0.47
- Local average price per kWh
- $0.42
Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.
05 / Expected financial performance
Projected · Baseline scenario · site level, before fund fees
36%
Projected IRR$175K
Year-3 annual cash flow$712K
Est. gross charging revenue / yr2.7 years
Payback$2.51M
Lifetime cash generated over 15 years$6.07 back per $1
6.1xReturn per $1 investedProjected cumulative cash flow
Baseline Downside
Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.
Upside drivers
- ◇Incentives and credit advances: $336,000 of identified incentives can reduce the capital required.
- ◇Utilization growth: Carbon underwrites 38.5%; nearby comparable stations already reach 39%.
- ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.
Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 38.5% utilization × $0.47 per kWh. Shown at the underwritten utilization in both scenarios.
Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.
Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.
This site in the fund
2%Share of fund stalls
Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.
06 / Nearby tenants & amenities
Nearby places are available in the online edition.
07 / Readiness
- 1
Site control
Not reported
- 2
Tesla approval
Not reported
- 3
Utility capacity
Not reported
- 4
Permits
Not reported
- 5
Construction
Not reported
- 6
Energized
Not reported
Fund terms
Fund details and disclosures →- Minimum investment
- $100
- Target net yield
- 11–17% (target)
- Distributions
- Monthly (target)
Research as of 2026-11-14. Sources: Paren, weekly average of the last 3 months (read Nov 14, 2026).
Virginia Avenue