CarbonACCESS

Testing the watersNo money is being solicited or accepted. An indication of interest involves no obligation. Read the notice

Term sheet signed

Hughes Lane

Bakersfield, CA

Illustrative image

Projected IRR
26.3%

Projected

Est. annual revenue
$943K

Projected

Stalls
8

Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.

01 / Comparable charging stations

0 stations within 3 miles. Select a row to find it on the map.

02 / Site summary

Rip-and-replace (full reuse) site with 8 Supercharger stalls at a shopping center location in Bakersfield, CA.

Property type
Shopping center
Utility
PG&E
Proposed stalls — V4 Supercharger
8
Opportunity type
Rip-and-replace (full reuse)
Agreement type
Ground lease
Term
15 years
Renewals
-
  • ◇114,000 vehicles a day on the nearest arterial
  • ◇5 fast-charging sites within 3 miles averaging 40.8% utilization
  • ◇Qualifies for clean fuel credits
  • ◇Freeway access nearby

03 / Trade area & traffic

70,000

Daytime population

$48,000

Median household income

39%

Of local EVs are Teslas

114,000

Daily traffic (AADT)
Median household income, trade area
$48,000
Freeway access
Yes
Fast-charging ports within 3 mi
25
Fast-charging sites within 3 mi
5

South Bakersfield commercial and industrial district Carbon estimates; not independently verified.

04 / Charging demand

Observed utilization at comparable stations

40.8%

Range across 1 reported comparable station, 40.8% blended. Carbon underwrites 36.6%.

0%20%40%60%
Underwritten utilization
36.6%
Modeled price per kWh
$0.49
Local average price per kWh
$0.44

Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.

05 / Expected financial performance

Projected · Baseline scenario · site level, before fund fees

Projected

26.3%

Projected IRR
Projected

$244K

Year-3 annual cash flow
Projected

$943K

Est. gross charging revenue / yr
Projected

3.7 years

Payback
Projected

$3.5M

Lifetime cash generated over 15 years
Projected

$4.33 back per $1

4.3xReturn per $1 invested

Projected cumulative cash flow

Baseline Downside

Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.

Upside drivers

  • ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
  • ◇Utilization growth: Carbon underwrites 36.6%; nearby comparable stations already reach 40.8%.
  • ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.

Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 36.6% utilization × $0.49 per kWh. Shown at the underwritten utilization in both scenarios.

Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.

Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.

This site in the fund

2.6%Share of fund stalls

Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.

06 / Nearby tenants & amenities

Nearby places are available in the online edition.

07 / Readiness

  1. 1

    Site control

    Not reported

  2. 2

    Tesla approval

    Not reported

  3. 3

    Utility capacity

    Not reported

  4. 4

    Permits

    Not reported

  5. 5

    Construction

    Not reported

  6. 6

    Energized

    Not reported

Minimum investment
$100
Target net yield
11–17% (target)
Distributions
Monthly (target)

Research as of 2026-11-14. Sources: Carbon OS comparable-station survey.