
San Pablo Avenue
Hercules, CA
Illustrative image
- Projected IRR
- 27.1%
- Est. annual revenue
- $1.14M
- Stalls
- 8
- Est. energization
- May 2027
Projected
Projected
Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.
01 / Comparable charging stations
1 station within 3 miles. Select a row to find it on the map.
02 / Site summary
Greenfield site with 8 Supercharger stalls at a shopping center location in Hercules, CA.
- Property type
- Shopping center
- Utility
- PG&E
- Grid capacity
- 2.7 MW available, three-phase
- Proposed stalls — V4 Supercharger
- 8
- Opportunity type
- Greenfield
- Agreement type
- License agreement
- Term
- 10 years
- Renewals
- -
- Target energization
- May 2027
- ◇185,000 vehicles a day on the nearest arterial
- ◇7 fast-charging sites within 3 miles averaging 48.6% utilization
- ◇Utility feeder shows 2.7 MW of available load capacity
- ◇Qualifies for clean fuel credits
- ◇Freeway access nearby
03 / Trade area & traffic
52,000
Daytime population$129,397
Median household income50%
Of local EVs are Teslas185,000
Daily traffic (AADT)- Median household income, trade area
- $129,397
- Freeway access
- Yes
- Fast-charging ports within 3 mi
- 27
- Fast-charging sites within 3 mi
- 7
East Bay I-80 corridor retail hub and commuter base Carbon estimates; not independently verified.
04 / Charging demand
Observed utilization at comparable stations
48.6%
Range across 1 reported comparable station, 48.6% blended. Carbon underwrites 41.9%.
- Underwritten utilization
- 41.9%
- Tesla Supercharger stations within 3 mi
- 1 · avg 48.6%
- Modeled price per kWh
- $0.52
- Local average price per kWh
- $0.47
Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.
05 / Expected financial performance
Projected · Baseline scenario · site level, before fund fees
27.1%
Projected IRR$314K
Year-3 annual cash flow$1.14M
Est. gross charging revenue / yr3.6 years
Payback$2.94M
Lifetime cash generated over 10 years$2.92 back per $1
2.9xReturn per $1 investedProjected cumulative cash flow
Baseline Downside
Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.
Upside drivers
- ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
- ◇Utilization growth: Carbon underwrites 41.9%; nearby comparable stations already reach 48.6%.
- ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.
Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 41.9% utilization × $0.52 per kWh. Shown at the underwritten utilization in both scenarios.
Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.
Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.
This site in the fund
2.6%Share of fund stalls
Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.
06 / Nearby tenants & amenities
Nearby places are available in the online edition.
07 / Readiness
Site control
complete
Tesla approval
complete
Utility capacity
complete
- 4
Permits
in progress
- 5
Construction
not started
- 6
Energized
Not reported
Fund terms
Fund details and disclosures →- Minimum investment
- $100
- Target net yield
- 11–17% (target)
- Distributions
- Monthly (target)
Research as of 2026-11-14. Sources: PG&E GRIP (Load ICA) · Carbon OS comparable-station survey.
San Pablo Avenue
