CarbonACCESS

Testing the watersNo money is being solicited or accepted. An indication of interest involves no obligation. Read the notice

Term sheet signed

North County Mall

Escondido, CA

Illustrative image

Projected IRR
22%

Projected

Est. annual revenue
$761K

Projected

Stalls
8

Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.

01 / Comparable charging stations

1 station within 3 miles. Select a row to find it on the map.

02 / Site summary

Greenfield site with 8 Supercharger stalls at a regional mall location in Escondido, CA.

Property type
Shopping center
Utility
SDG&E
Proposed stalls — V4 Supercharger
8
Opportunity type
Greenfield
Agreement type
Ground lease
Term
15 years
Renewals
-
  • ◇205,000 vehicles a day on the nearest arterial
  • ◇2 fast-charging sites within 3 miles averaging 29.3% utilization
  • ◇Qualifies for clean fuel credits
  • ◇Freeway access nearby

03 / Trade area & traffic

90,000

Daytime population

$86,000

Median household income

49%

Of local EVs are Teslas

205,000

Daily traffic (AADT)
Median household income, trade area
$86,000
Freeway access
Yes
Fast-charging ports within 3 mi
9
Fast-charging sites within 3 mi
2

Regional mall hub serving Escondido and Rancho Bernardo Carbon estimates; not independently verified.

04 / Charging demand

Observed utilization at comparable stations

20% – 41%

Range across 3 reported comparable stations, 31.3% blended. Carbon underwrites 26.3%.

0%20%40%60%
Underwritten utilization
26.3%
Tesla Supercharger stations within 3 mi
1 · avg 20%
Modeled price per kWh
$0.55
Local average price per kWh
$0.45

Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.

05 / Expected financial performance

Projected · Baseline scenario · site level, before fund fees

Projected

22%

Projected IRR
Projected

$193K

Year-3 annual cash flow
Projected

$761K

Est. gross charging revenue / yr
Projected

3.4 years

Payback
Projected

$2.76M

Lifetime cash generated over 15 years
Projected

$4.94 back per $1

4.9xReturn per $1 invested

Projected cumulative cash flow

Baseline Downside

Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.

Upside drivers

  • ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
  • ◇Incentives and credit advances: $400,000 of identified incentives can reduce the capital required.
  • ◇Utilization growth: Carbon underwrites 26.3%; nearby comparable stations already reach 41%.
  • ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.

Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 26.3% utilization × $0.55 per kWh. Shown at the underwritten utilization in both scenarios.

Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.

Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.

This site in the fund

2.6%Share of fund stalls

Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.

06 / Nearby tenants & amenities

Nearby places are available in the online edition.

07 / Readiness

  1. 1

    Site control

    Not reported

  2. 2

    Tesla approval

    Not reported

  3. 3

    Utility capacity

    Not reported

  4. 4

    Permits

    Not reported

  5. 5

    Construction

    Not reported

  6. 6

    Energized

    Not reported

Minimum investment
$100
Target net yield
11–17% (target)
Distributions
Monthly (target)

Research as of 2026-11-14. Sources: Carbon OS comparable-station survey.