CarbonACCESS

Testing the watersNo money is being solicited or accepted. An indication of interest involves no obligation. Read the notice

Term sheet signed

Hilton Garden Inn SF/Oakland Bay Bridge

Emeryville, CA

Illustrative image

Projected IRR
35.6%

Projected

Est. annual revenue
$1.31M

Projected

Stalls
8

Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.

01 / Comparable charging stations

2 stations within 3 miles. Select a row to find it on the map.

02 / Site summary

Greenfield site with 8 Supercharger stalls at a hotel location in Emeryville, CA.

Property type
Hotel
Utility
PG&E
Grid capacity
1.7 MW available, three-phase
Proposed stalls — V4 Supercharger
8
Opportunity type
Greenfield
Agreement type
Ground lease
Term
15 years
Renewals
-
  • ◇260,000 vehicles a day on the nearest arterial
  • ◇17 fast-charging sites within 3 miles averaging 57.3% utilization
  • ◇Utility feeder shows 1.7 MW of available load capacity
  • ◇Qualifies for clean fuel credits
  • ◇Freeway access nearby

03 / Trade area & traffic

130,000

Daytime population

$120,239

Median household income

48%

Of local EVs are Teslas

260,000

Daily traffic (AADT)
Median household income, trade area
$120,239
Freeway access
Yes
Fast-charging ports within 3 mi
119
Fast-charging sites within 3 mi
17

Dense Bay Bridge approach and commercial district Carbon estimates; not independently verified.

04 / Charging demand

Observed utilization at comparable stations

52% – 62%

Range across 2 reported comparable stations, 57% blended. Carbon underwrites 47.3%.

0%26.7%53.3%80%
Underwritten utilization
47.3%
Tesla Supercharger stations within 3 mi
2 · avg 57%
Modeled price per kWh
$0.53
Local average price per kWh
$0.48

Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.

05 / Expected financial performance

Projected · Baseline scenario · site level, before fund fees

Projected

35.6%

Projected IRR
Projected

$396K

Year-3 annual cash flow
Projected

$1.31M

Est. gross charging revenue / yr
Projected

2.7 years

Payback
Projected

$5.68M

Lifetime cash generated over 15 years
Projected

$5.92 back per $1

5.9xReturn per $1 invested

Projected cumulative cash flow

Baseline Downside

Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.

Upside drivers

  • ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
  • ◇Utilization growth: Carbon underwrites 47.3%; nearby comparable stations already reach 62%.
  • ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.

Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 47.3% utilization × $0.53 per kWh. Shown at the underwritten utilization in both scenarios.

Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.

Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.

This site in the fund

2.6%Share of fund stalls

Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.

06 / Nearby tenants & amenities

Nearby places are available in the online edition.

07 / Readiness

  1. 1

    Site control

    Not reported

  2. 2

    Tesla approval

    Not reported

  3. 3

    Utility capacity

    Not reported

  4. 4

    Permits

    Not reported

  5. 5

    Construction

    Not reported

  6. 6

    Energized

    Not reported

Minimum investment
$100
Target net yield
11–17% (target)
Distributions
Monthly (target)

Research as of 2026-11-14. Sources: PG&E GRIP (Load ICA) · Carbon OS comparable-station survey.