CarbonACCESS

Testing the watersNo money is being solicited or accepted. An indication of interest involves no obligation. Read the notice

Under construction

Culver Commons

Culver City, CA

Projected IRR
30.7%

Projected

Est. annual revenue
$1.05M

Projected

Stalls
8
Est. energization
Apr 2027

Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.

01 / Comparable charging stations

7 stations within 3 miles. Select a row to find it on the map.

02 / Site summary

New construction site with 8 Supercharger stalls at a shopping center location in Culver City, CA.

Property type
Shopping center
Utility
SCE
Grid capacity
5.2 MW available, three-phase
Proposed stalls — V4 Supercharger
8
Opportunity type
New construction
Agreement type
License
Term
10 years
Renewals
-
Target energization
Apr 2027
  • ◇54,161 vehicles a day on the nearest arterial
  • ◇12 fast-charging sites within 3 miles averaging 40% utilization
  • ◇Utility feeder shows 5.2 MW of available load capacity
  • ◇Qualifies for clean fuel credits
  • ◇Freeway access nearby

03 / Trade area & traffic

210,000

Daytime population

$108,000

Median household income

54%

Of local EVs are Teslas

54,161

Daily traffic (AADT)
Median household income, trade area
$108,000
Freeway access
Yes
Fast-charging ports within 3 mi
33
Fast-charging sites within 3 mi
12

Affluent Westside Los Angeles tech and creative employment node Carbon estimates; not independently verified.

04 / Charging demand

Observed utilization at comparable stations

20% – 59%

Range across 11 reported comparable stations, 38.9% blended. Carbon underwrites 40%.

0%20%40%60%
Underwritten utilization
40%
Tesla Supercharger stations within 3 mi
7 · avg 43.9%
Modeled price per kWh
$0.50
Local average price per kWh
$0.46

Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.

05 / Expected financial performance

Projected · Baseline scenario · site level, before fund fees

Projected

30.7%

Projected IRR
Projected

$269K

Year-3 annual cash flow
Projected

$1.05M

Est. gross charging revenue / yr
Projected

3.1 years

Payback
Projected

$2.52M

Lifetime cash generated over 10 years
Projected

$3.34 back per $1

3.3xReturn per $1 invested

Projected cumulative cash flow

Baseline Downside

Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.

Upside drivers

  • ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
  • ◇Utilization growth: Carbon underwrites 40%; nearby comparable stations already reach 59%.
  • ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.

Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 40% utilization × $0.50 per kWh. Shown at the underwritten utilization in both scenarios.

Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.

Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.

This site in the fund

2.6%Share of fund stalls

Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.

06 / Nearby tenants & amenities

Nearby places are available in the online edition.

07 / Readiness

  1. Site control

    complete

  2. Tesla approval

    complete

  3. Utility capacity

    complete

  4. Permits

    complete

  5. 5

    Construction

    in progress

  6. 6

    Energized

    Not reported

Minimum investment
$100
Target net yield
11–17% (target)
Distributions
Monthly (target)

Research as of 2026-11-14. Sources: SCE DRPEP (Load ICA) · Paren, weekly average of the last 3 months (read Nov 14, 2026).