Cabazon Outlets
Cabazon, CA
Illustrative image
- Projected IRR
- 19.3%
- Est. annual revenue
- $1.15M
- Stalls
- 12
Projected
Projected
Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.
01 / Comparable charging stations
2 stations within 3 miles. Select a row to find it on the map.
02 / Site summary
Greenfield site with 12 Supercharger stalls at a outlet center location in Cabazon, CA.
- Property type
- Shopping center
- Utility
- SCE
- Proposed stalls — V4 Supercharger
- 12
- Opportunity type
- Greenfield
- Agreement type
- Ground lease
- Term
- 15 years
- Renewals
- -
- ◇136,000 vehicles a day on the nearest arterial
- ◇2 fast-charging sites within 3 miles averaging 28.5% utilization
- ◇Qualifies for clean fuel credits
- ◇Freeway access nearby
03 / Trade area & traffic
26,000
Daytime population$47,000
Median household income48%
Of local EVs are Teslas136,000
Daily traffic (AADT)- Median household income, trade area
- $47,000
- Freeway access
- Yes
- Fast-charging ports within 3 mi
- 8
- Fast-charging sites within 3 mi
- 2
High-volume I-10 outlet destination in low-density San Gorgonio Pass Carbon estimates; not independently verified.
04 / Charging demand
Observed utilization at comparable stations
24.4% – 33.9%
Range across 2 reported comparable stations, 29.2% blended. Carbon underwrites 28.1%.
- Underwritten utilization
- 28.1%
- Tesla Supercharger stations within 3 mi
- 2 · avg 29.2%
- Modeled price per kWh
- $0.52
- Local average price per kWh
- $0.47
Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.
05 / Expected financial performance
Projected · Baseline scenario · site level, before fund fees
19.3%
Projected IRR$258K
Year-3 annual cash flow$1.15M
Est. gross charging revenue / yr5.0 years
Payback$3.71M
Lifetime cash generated over 15 years$3.25 back per $1
3.3xReturn per $1 investedProjected cumulative cash flow
Baseline Downside
Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.
Upside drivers
- ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
- ◇Incentives and credit advances: $400,000 of identified incentives can reduce the capital required.
- ◇Utilization growth: Carbon underwrites 28.1%; nearby comparable stations already reach 33.9%.
- ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.
Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 28.1% utilization × $0.52 per kWh. Shown at the underwritten utilization in both scenarios.
Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.
Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.
This site in the fund
3.9%Share of fund stalls
Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.
06 / Nearby tenants & amenities
Nearby places are available in the online edition.
07 / Readiness
- 1
Site control
Not reported
- 2
Tesla approval
Not reported
- 3
Utility capacity
Not reported
- 4
Permits
Not reported
- 5
Construction
Not reported
- 6
Energized
Not reported
Fund terms
Fund details and disclosures →- Minimum investment
- $100
- Target net yield
- 11–17% (target)
- Distributions
- Monthly (target)
Research as of 2026-11-14. Sources: Carbon OS comparable-station survey.