
Anaheim Hills Village Center
Anaheim, CA
Illustrative image
- Projected IRR
- 34.6%
- Est. annual revenue
- $932K
- Stalls
- 8
- Est. energization
- May 2027
Projected
Projected
Projected, site-level, before fund fees and expenses. Not a guarantee of future performance.
01 / Comparable charging stations
4 stations within 3 miles. Select a row to find it on the map.
02 / Site summary
Rip-and-replace (partial reuse) site with 8 Supercharger stalls at a shopping center location in Anaheim, CA.
- Property type
- Shopping center
- Utility
- Anaheim
- Proposed stalls — V4 Supercharger
- 8
- Opportunity type
- Rip-and-replace (partial reuse)
- Agreement type
- Ground lease
- Term
- 15 years
- Renewals
- -
- Target energization
- May 2027
- ◇205,750 vehicles a day on the nearest arterial
- ◇7 fast-charging sites within 3 miles averaging 32.7% utilization
- ◇Qualifies for clean fuel credits
- ◇Freeway access nearby
03 / Trade area & traffic
90,000
Daytime population$138,741
Median household income54%
Of local EVs are Teslas205,750
Daily traffic (AADT)- Median household income, trade area
- $138,741
- Freeway access
- Yes
- Fast-charging ports within 3 mi
- 16
- Fast-charging sites within 3 mi
- 7
Affluent Anaheim Hills Hwy 91 retail corridor Carbon estimates; not independently verified.
04 / Charging demand
Observed utilization at comparable stations
29% – 36%
Range across 4 reported comparable stations, 33.3% blended. Carbon underwrites 35.5%.
- Underwritten utilization
- 35.5%
- Tesla Supercharger stations within 3 mi
- 4 · avg 33.3%
- Modeled price per kWh
- $0.50
- Local average price per kWh
- $0.48
Underwritten figures are estimates. Dots show measured comparable stations; the triangle marks Carbon’s underwritten level.
05 / Expected financial performance
Projected · Baseline scenario · site level, before fund fees
34.6%
Projected IRR$361K
Year-3 annual cash flow$932K
Est. gross charging revenue / yr2.8 years
Payback$5.18M
Lifetime cash generated over 15 years$5.64 back per $1
5.6xReturn per $1 investedProjected cumulative cash flow
Baseline Downside
Starts at minus net capital in year 0. Cash flow ramps to 50% of the stabilized level in year 1 and 85% in year 2, then stays flat; the chart's payback point reflects that ramp, while the Payback tile is Carbon's underwritten figure.
Upside drivers
- ◇Clean fuel credits (LCFS): the site is in a state with a clean fuel standard, so charging can generate credits that are not included in the baseline.
- ◇Utilization growth: Carbon underwrites 35.5%; nearby comparable stations already reach 36%.
- ◇Renewals: any renewal of the agreement would extend cash flow beyond the initial term.
Est. gross charging revenue = stalls × 8,760 hours × 75 kW average delivered × 35.5% utilization × $0.50 per kWh. Shown at the underwritten utilization in both scenarios.
Lifetime cash = sum of annual cash flow over the term with a two-year ramp (year 1 at 50%, year 2 at 85%, year 3 onward at 100% of year-3 cash flow). Return per $1 = lifetime cash ÷ net capital.
Projected, site-level, before fund fees and expenses. Based on Carbon's underwriting of comparable stations; actual results will vary. Investors own units of the fund, not this site; fund-level returns differ. Not a guarantee of future performance.
This site in the fund
2.6%Share of fund stalls
Investor returns come from the whole fund, not one site. Site-level projections on this page are before fund fees and expenses; fund-level returns differ.
06 / Nearby tenants & amenities
Nearby places are available in the online edition.
07 / Readiness
Site control
complete
Tesla approval
complete
Utility capacity
complete
- 4
Permits
not started
- 5
Construction
not started
- 6
Energized
Not reported
Fund terms
Fund details and disclosures →- Minimum investment
- $100
- Target net yield
- 11–17% (target)
- Distributions
- Monthly (target)
Research as of 2026-11-14. Sources: Carbon OS comparable-station survey.
Anaheim Hills Village Center
